High performance spray adhesive used to bond the EPS400 overlay floor panel to the subfloor. The spray adhesive is a fast and effective method that greatly reduces install times with no increase to height build up while minimising waste and overuse.
When laying the overlay board to a wooden subfloor, simply spray the floor and apply the board to the glue, one board at a time. When laying onto wood a single can will cover 5sqm.
When laying the boards to concrete or similar substrates with a high consumption rate, spray the floor and the underside of the board so you are bonding glue to glue. This method will give 2.5sqm coverage per can.
Consumption Rate:
Wooden subfloors: 5sqm/can
Concrete subfloors: 2.5sqm/can
1. Prepare the subfloor by clearing all loose debris to ensure a true bond
2. Read the instruction as stated on the can
3. If laying the boards onto a wooden subfloor, spray the subfloor where the first board will be laid. If laying onto concrete, spray the back of the overlay board as well as the subfloor
4. Lay the overlay board down and apply pressure across the surface. Make sure you have it right as the bond will take very quickly
5. Repeat until the room is covered